![](https://waterhistoryphl.org/wp-content/uploads/2004.019.0010B_crop.jpg?w=300)
![](https://waterhistoryphl.org/wp-content/uploads/2004.019.0010B_crop.jpg?w=300)
![Torresdale Conduit work gang, 1906](https://waterhistoryphl.org/wp-content/uploads/D.5_FINAL_1986.002.2546_crop-1-scaled.jpg?w=300)
Torresdale Conduit work gang, 12/18/1906
![Finished Upper Roxborough filters, 1903](https://waterhistoryphl.org/wp-content/uploads/D.1b_FINAL_1986.002.1032-1-scaled.jpg?w=300)
Finished Upper Roxborough filters, 1903
![Upper Roxborough filter beds](https://waterhistoryphl.org/wp-content/uploads/D.1a_FINAL_1986.002.0660-61-62-1.jpg?w=300)
Upper Roxborough filter beds under construction, July 1902
![Centerfold of 1955 brochure depicting the Southeast Sewage Treatment Works](https://waterhistoryphl.org/wp-content/uploads/DR_SEPlant1955centerfold.jpg?w=300)
Southeast Sewage Treatment Works diagram, 1955
![Spring Garden Sewage Experiment Station, used to test water filtration methods](https://waterhistoryphl.org/wp-content/uploads/DR_SpringGardenSewExpSta1911.jpg?w=300)
Outside Sprinkling Filters, Spring Garden Sewage Experiment Station, 1911
![Black-and-white photograph showing the completed Upper Roxborough Filter system. Vaulted concrete ceiling with beds of filter sand.](https://waterhistoryphl.org/wp-content/uploads/D.1b_FINAL_1986.002.1032.jpg?w=300)