Plan of Pine Street Sewer, 1830
The "present surface" of the ground will be cut down in the process of building this sewer, with the final level of the street shown in the regular line below. Some of the soil cut away from the high ground will be used to fill the low ground at the outlet of the pipe, at the Schuylkill River.